The Ship Model Forum

The Ship Modelers Source
It is currently Tue Jun 24, 2025 5:39 pm

All times are UTC - 6 hours [ DST ]




Post new topic Reply to topic  [ 111 posts ]  Go to page Previous  1, 2, 3, 4, 5, 6  Next
Author Message
PostPosted: Sun May 12, 2024 11:09 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
StevenVD wrote:
Nice paint finish. About the amount of portholes in the PE set, these were probably only meant for locations where the hull angle is very oblique or curved. In models the portholes are cast in the direction of the mould, resulting in oval holes when an angle or round exists.


Yes you're right. Infact in the bow I had to close the portholes with the putty and then redoing them after applying the PE. With this method the portholes are still rounded


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Tue May 28, 2024 8:40 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
Hi guys here I am with an update.

weathering on the hull is done. I'm not really good with this technique, so I always do light weathering.
Image
Image

Next step is to glue the deck with the hull.

I have begun to take a look at the superstructure and above all the first level.

I must admit pontos instructions are really bad. Many details miss or lack of informations.
An example is the end of the first level on the stern side. These stairs have to be kept or have to be erased?
Image

Instructions don't say anything. Fortunately I have found in the corner of an image the solution.
They must be erased. Yes but with what? No number is indicated. So I have to check every single stair to check what's the right one with the link between the deck and the stair
Image

Same thing with the steps. There's a PE paper full of steps and portholes but they are never indicated. So are them optionals?
Image

So I'm beginnning I can use them where is indicated. Not easy to drill in line with 0.3 mm
Image

Hope doing things good


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Thu May 30, 2024 1:36 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
Beginning to add steps.

I'm loosing my eyes!! :Mad_6:
Image


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Thu May 30, 2024 8:14 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
Here 3 pictures about the hull full painted and with the turrets

Image
Image
Image


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Tue Jun 11, 2024 2:11 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
A little update.
Doing the PE for the A level deck.

Next step is to glue the Pe with their plastic parts and then primering all.

Image


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Mon Jul 01, 2024 3:45 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
Hi guys, I'm back to work.

After completing all PE of the first deck, it's time to glue them to the plastic.
Image

Image
Image

But now a great doubt has come in my mind: how to do the other side!
Doing this side, I leaned the structure on the base, but when I will do the other side, I can't lean the structure because there are all the PE.

So how can I block the structure avoiding leaning it on the base so I can work easly and it withstand the pressure of the drilling and gluing?

Any idea?
Thanks!


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Mon Jul 01, 2024 12:56 pm 
Offline

Joined: Fri Dec 27, 2013 6:32 pm
Posts: 548
Be sure to remove all plastic steps if you bought a Pontos set, they would not leave any of those on the model. To do the other side, put some clamps where the PE is not fragile and use these as a base. Like I did here to spare the yardarms if the island falls over:

Image

And don't forget to replace the watertight doors behind the DP guns, they won't tell you for every instance of them, typically they only show you once...


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Tue Jul 02, 2024 1:37 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
Hi Steven, thanks for the tip!
It's a good idea! I will try.

For the work yes I have noticed Pontos' instructions are not really really clear and so I check many times different sources before doing anything.


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Jul 05, 2024 2:46 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
Problem solved for blocking the piece while working on it!

Image
Image

Some of my daughter's little toys are also useful! :heh:


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Tue Jul 09, 2024 4:10 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
And one side is ended!

Image


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Thu Jul 11, 2024 10:22 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
Hi all, little update

I've also completed the other side of the structure. It seems to have turned out quite well. Obviously the back of the plastic is completely massacred with holes etc., but so even looking through the grates you can't see the gray and above all once the primer has been applied it doesn't plug but always remains open.
Image

Now a new problem! :Mad_6:

Image

Fortunately I have now learned to re-check everything, to check pieces that have came off (because unfortunately they do come off :doh_1: ) and then in checking what to put on the flat part (let's say the first level) I discovered that a large PE must be glued on top, and some "rails" which are in the circled part must also be added.
The problem is that these damn instructions are not complete or perhaps they are made for professional model makers, because they don't say anything about the parts to be erased. That flat piece in itself wouldn't fit on the plastic because there are several small bumps that don't make the PE stick. and
so the y must be erased. Even the 4 squares along the line of the catapult (two are covered by the red line of the circle) do not match perfectly with the holes in the PE and therefore I had to adapt them.

I honestly have to say that I find these instructions very incomplete and they make me angry every time. He could have put a series of images on the first page of what to erase piece bye piece instead of putting everything together.

Now I don't understand how these binaries should be placed: vertically on the little squares in order to create the suspended track, or horizontally with the squares facing outwards as in the instructions or I still have to fold the squares in order to have the track vertically and the squares horizontally as support.
In the 2 books I have as a reference there aren't even any tracks, so unfortunately I don't have any possible reference.
My goodness, what patience!!!


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Thu Jul 11, 2024 11:46 am 
Offline

Joined: Fri Dec 27, 2013 6:32 pm
Posts: 548
Which books do you have? I used this one and found it useful. I believe the rails would be extended only when the hangar was open.


Attachments:
20240711_184304.jpg
20240711_184304.jpg [ 2.37 MiB | Viewed 873 times ]
20240711_184351.jpg
20240711_184351.jpg [ 3.01 MiB | Viewed 873 times ]
Report this post
Top
 Profile  
Reply with quote  
PostPosted: Thu Jul 11, 2024 1:00 pm 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
Thanks Steven.
If you look at the first post of the first page you see the two books. One is Anatomy of the ship, the other one is super drawings in 3D.


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Thu Jul 11, 2024 1:57 pm 
Offline

Joined: Fri Dec 27, 2013 6:32 pm
Posts: 548
I once checked the Scharnhorst edition of that Anatomy book and put it back. For all the beautiful 3D renderings these publications have, there are little reference pics. See if you can get a Warship Pictorial or Squadron booklet for completeness. The Kagero books are comparable, I just bought some too. One danger I encountered in this pictorial is that some elements were mirrored on the CAD drawing according to the pictures.


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Mon Jul 15, 2024 10:12 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
In the meantime I went foward.
Finally all primed!

Image
Image
Image
Image
Image

Moving foward to the next part of the foward superstructure
Put the doors, portholes and step even if they weren't indicated in the instructions (better realism for me!)
Image
Image

Now the eternal doubt: assembling all togheter and then primering, eventually sanding or putting putty where PE and plastic don't fix well and then painting everything, or assembling each part standalone and then correct and possibly fill the parts that are not well aligned?
My doubts are about the external parts of the PE which have to mach with the plastic parts.
Image


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Wed Jul 17, 2024 2:23 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
I have decided to complete the parts separately because the 2 parts match very well and I can fill the little gap after.

Now beginning with the camouflage on the first level of the superstructure.

Image


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Wed Jul 17, 2024 12:41 pm 
Offline

Joined: Thu Apr 09, 2009 1:52 pm
Posts: 166
great work :thumbs_up_1:


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Thu Jul 18, 2024 3:57 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
Thanks mick

Now I'm doing some test to dry fit with the upper part of the foward superstructure.
I also wanna see the if the camouflage will continue in the right areas in the upper part.
After I will complete with the white line

Image
Image


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Mon Jul 22, 2024 9:14 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
Hi guys,finally the first level of the main deck is completed.
Only weathering misses an some other stuff that will be added

Image
Image
Image
Image


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Jul 26, 2024 9:28 am 
Offline

Joined: Mon Feb 13, 2023 4:29 am
Posts: 160
Hi guys, here the final update for this week.

Second level completed also with light weathering.
only compasses and binocular misses.
Also the 2 footbridges miss, because I wait to them. I'm sure I would beat them during the work on the ship, so I will make them when foward superstructure is ended.

Image
Image
Image
Image

Here a test with all dry fitted.
Now I have ended all little details on the base of the superstructure so I think I can glue it on the ship.

Image
Image

And here first check if all parts of the foward second level fit well.
Image

That's all for this week :thumbs_up_1:


Report this post
Top
 Profile  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 111 posts ]  Go to page Previous  1, 2, 3, 4, 5, 6  Next

All times are UTC - 6 hours [ DST ]


Who is online

Users browsing this forum: Bing [Bot] and 21 guests


You can post new topics in this forum
You can reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  
Powered by phpBB® Forum Software © phpBB Group