
The box is fitting well into the superstructure.

BBB has some enormous anti-skid surfaces to add to the kit. These are quite thin and have to be straightened. The plastic obstacles need to be removed.

I don't find the source BBB uses to determine the anti-slip locations, at least the one on the hangar deck is wrong. But the detail is so beautiful I want it on Dunkerque too. Maybe I find some generic plat at IPMS Houten this weekend.

A small part of the superstructure is covered with PE plating. I don't see the point, because the thin splintershield now borders the thicker (though commendable) plastic shield behind it.

All watertight doors are now installed with an open doorway. I suppose some will fall off after a while, I can always shut them later.

The boat supports are a nice extra detail with their tensioning cables, but the instruction is extremly rudimentary and doesn't even show the direction of the parts.

The bollards are all replaced now, something Dunkerque would also be missing if I don't find a solution.

To check the fit of the wood deck, I had to move some of the PE doors.

To place the right door types I had to check on Dunkerque, all Strasbourg doors are drilled away and as mentioned no instructions are available.


Then it's Dunkerque's turn.






































































































































