Page 21 of 103

Re: Dave's Kiev

Posted: Fri Feb 29, 2008 1:18 am
by Sean Hert
Dave- very nice! I am inspired!

But, not to be a pain, but the pics show more ribs on the bases than you have on yours, Is this intentional?

Re: Dave's Kiev

Posted: Fri Feb 29, 2008 6:26 am
by Dave Wooley
Mike Glasgow wrote:Thanks for posting those close shots of your tools. I have learned a lot from all the builds here. I saw the name Olfa on the compass cutter after a second look and found their website. How thick of styrene have you cut with that compass cutter?
Hello Mike The largest diameter styrene tube i've been able to cut is 20mm .
Dave Wooley

Re: Dave's Kiev

Posted: Fri Feb 29, 2008 6:39 am
by Dave Wooley
Sean Hert wrote:Dave- very nice! I am inspired!

But, not to be a pain, but the pics show more ribs on the bases than you have on yours, Is this intentional?
Hi Sean Yes You are quite right. The reason for this is two fold . On one side of the mounting there is an inspection hatch which I really had no idea of size. Secondly and perhaps wrongly the ribs up the side of the mounting , with the thickness of section I have would have looked out of place if I'd included the two extra ribs. The making of the four AK 630s shown took about an hour . It's the pattern that takes the time.
Dave Wooley

Re: Dave's Kiev

Posted: Fri Feb 29, 2008 7:25 am
by nick
Amazing!!!!
:thumbs_up_1: :thumbs_up_1:

Re: Dave's Kiev

Posted: Fri Feb 29, 2008 9:09 am
by Sean Hert
Dave Wooley wrote: The reason for this is two fold . On one side of the mounting there is an inspection hatch which I really had no idea of size. Secondly and perhaps wrongly the ribs up the side of the mounting , with the thickness of section I have would have looked out of place if I'd included the two extra ribs. The making of the four AK 630s shown took about an hour . It's the pattern that takes the time.
Dave Wooley
Thanks for the reply!

I don't know if this helps, but here is a pic I took of the inspection hatch on the Hiddensee last year-
ak630.jpg
(Full size- http://www.modelwarships.com/features/w ... 30-03.html)

Re: Dave's Kiev

Posted: Sat Mar 01, 2008 4:36 am
by Dave Wooley
Hi Sean problem now solved. Thanks for your help but it's back to the drawing board ?
Dave Wooley

Re: Dave's Kiev

Posted: Mon Mar 03, 2008 9:33 am
by russclark
hi dave. nice work on the guns,gives me an option for 57and100mm guns on jb

Re: Dave's Kiev

Posted: Mon Mar 03, 2008 9:51 am
by gtb -red
Hi Dave, ever think about building a 1/144 Supercarrier? Nice work man!

Re: Dave's Kiev

Posted: Tue Mar 04, 2008 11:25 am
by Kiwimedic
Hi Dave
I have been looking at your build.
For a "Carrier" It is a very busy ship indeed.
As usual it is perfect.
Will you finish in time?


Regards
Phil.

Re: Dave's Kiev

Posted: Tue Mar 04, 2008 1:40 pm
by Dave Wooley
Hi Phil evey item excepting the WT doors and ships rails are scratch built so progress at times can be quite good but more often than not it all reduced to a crawl . Just completed the aerial arrays around the superstructure and like most of the build they required a degree of lateral thinking.
Dave Wooley :thumbs_up_1:

Re: Dave's Kiev

Posted: Tue Apr 29, 2008 11:45 am
by Dave Wooley
It�s been a while since any posts but progress has been made .
This post deals with scratch building the Base Tilt fire control
radar for the 30mm CIWS.
Evergreen styrene tube the basic components of the Base Tilt fire control radar.
Image
The next stage was to form the convex face of the radar using P38 fillers.
Image
All the parts for one Base Tilt cut to size and ready to be assembled
Image
Before assembly a more refined shape was required that matched the
drawings and the parts are cut to size and placed in position.
Image Image
The top panel is fired in to the general shape.
Image
Parts ready for assembly
Image
Multiple Base Tilt ready for assembly
Image
Progressive assembly
Image
Image
The base
Image
Taking shape
Image
Image
Image
Image
4 completed Base Tilt fire control with the AK630 30mm in the back ground
Image
Base Tilt and 2- 30mm CIWS mounted temporarily on the port sponson
Image

Re: Dave's Kiev

Posted: Tue Apr 29, 2008 12:10 pm
by ARH
Brilliant Dave, a lot of work for just a small part, :woo_hoo: :woo_hoo: :thumbs_up_1:

Re: Dave's Kiev

Posted: Tue Apr 29, 2008 4:14 pm
by Laurent
Nice work indeed , as is the methodology !

Laurent

Re: Dave's Kiev

Posted: Tue Apr 29, 2008 5:21 pm
by Jefgte
Always nice scratch Dave...always

:thumbs_up_1:


Jef

Re: Dave's Kiev

Posted: Tue Apr 29, 2008 10:08 pm
by J. Soca
Impressive indeed !!! :thumbs_up_1: :thumbs_up_1:

Re: Dave's Kiev

Posted: Mon May 05, 2008 1:38 pm
by gtb -red
Your just good man!! :thumbs_up_1:

Re: Dave's Kiev

Posted: Tue May 06, 2008 1:46 pm
by Dave Wooley
Thanks for all your kind comments. Pressing on with the rails around the superstructure , it's now starting to look busy . More posts to come . :thumbs_up_1: :wave_1:
Dave Wooley

Re: Dave's Kiev

Posted: Wed May 07, 2008 1:33 pm
by Dave Wooley
More progress
Gordon Brookes Russian type WT door PE at 1:144 scale
Image
The WT doors PE in place
Image
Side vents from Evergreen plastic sheet cut to size and temporally placed
into position
Image
Vent covers in place . These will be removed for painting
Image
A start has been made on fitting the Russian type 4 bar rails . many
of the platforms on Kiev are 4 bar. The upper platform is 3 bar.
Image
One section of rail is cut but not fitted as it would be difficult to re- fit
the vents at a later stage if this rail were in place.
Image
Viewing the same position but looking aft .
Image
Looking from above, radars everywhere .
Image
The island superstructure thus far . There remains many more smaller
pieces of detail to add before the first coat of paint can be applied.
Image
Dave Wooley :thumbs_up_1: :wave_1:

Re: Dave's Kiev

Posted: Wed May 07, 2008 3:38 pm
by ARH
Coming along very nicely Dave, :thumbs_up_1: :thumbs_up_1:

Re: Dave's Kiev

Posted: Wed May 07, 2008 5:42 pm
by Sean Hert
:faint: Wow.

I'm sooo jealous....