Dave Wooley
Is DDH a Japanese conundrum?
Moderators: Timmy C, Gernot, Olaf Held, JWintjes
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Is DDH a Japanese conundrum?
I note that the Japanese Maritime Defence Force are designing 4 vessels which are termed DDHs or helicopter carrying destroyers. Is the definition for these 20000ton through deck destroyers just another euphemism to avoid using the "C" word . This sounds rather familiar remember the "through Deck cruiser"
Dave Wooley
Dave Wooley
- chuck
- Posts: 3384
- Joined: Mon Jan 10, 2005 1:21 pm
- Location: equidistant to everywhere
I wonder what the Chinese will designate the former Varyag. She was bought under the pretext of conversion to floating casino. There is no news of slot machines being seen aboard, however aircraft handling non-skid surface has been applied.
Aircraft carrying blue water floating casino? You must enlist to gamble.
Aircraft carrying blue water floating casino? You must enlist to gamble.
- JWintjes
- Posts: 1223
- Joined: Mon Jan 10, 2005 11:41 am
- Location: turning into a power-hungry Yamato-models-munching monster... buahahahaha...
In all fairness it should be said that the operational doctrine behind the Japanese You-name-it is probably more carrier-like than that of the Russian breed of carriers (though that isn't really true for the latest one, obviously).chuck wrote:Even the 65,000 ton Russian carrier is still called an "Heavy Aviation Cruiser". Although it appears the Russians did get over the "C" part, they still have an hang up on the "Arrier" part.
Jorit

- JWintjes
- Posts: 1223
- Joined: Mon Jan 10, 2005 11:41 am
- Location: turning into a power-hungry Yamato-models-munching monster... buahahahaha...
Avaiation Amusement Liner...chuck wrote:I wonder what the Chinese will designate the former Varyag. She was bought under the pretext of conversion to floating casino. There is no news of slot machines being seen aboard, however aircraft handling non-skid surface has been applied.
Aircraft carrying blue water floating casino? You must enlist to gamble.
Here again, I'm really wondering what they'll eventually do with it.
Jorit

- chuck
- Posts: 3384
- Joined: Mon Jan 10, 2005 1:21 pm
- Location: equidistant to everywhere
It is looking very much like the flight deck at least will be brought to operational status, perhaps as an stationary training aid.
But I doubt the entire ship will actually be brought up to full operational status . The ship was delivered without engines, boilers, rudders or propellers. There hasn't been reports of new engineering plant being fitted while the ship is in Chinese possession. The deck work probably would not have been carried out if the ship were still to be gutted for the installation of new engineering plant.
This fits with recent reports of official Chinese indication of construction of indigenous 60,000 ton carrier slated for completion around 2012-2015. The Varyag was so gutted and so decrepit that bring her back to full operational status would probably cost as much as a new carrier, and such an effort would only make sense if the Chinese Navy needed a carrier and had no prospect of getting one tailor made to its requirements. If the Chinese are actually in the midst of a carrier construction right now, then converting the Varyag would make little sense. It would divert funds from domestic program which must receive favor if simply due to national pride. Having been designed for some one else's requirements it is unlikely to be perceived to fit Chinese needs as well as a native vessel. The amount of work involved means it would not get the Chinese a carrier much sooner than just waiting for their own. In all likelihood the Varyag will act purely as a training and engineering support for China's own carrier.
But I doubt the entire ship will actually be brought up to full operational status . The ship was delivered without engines, boilers, rudders or propellers. There hasn't been reports of new engineering plant being fitted while the ship is in Chinese possession. The deck work probably would not have been carried out if the ship were still to be gutted for the installation of new engineering plant.
This fits with recent reports of official Chinese indication of construction of indigenous 60,000 ton carrier slated for completion around 2012-2015. The Varyag was so gutted and so decrepit that bring her back to full operational status would probably cost as much as a new carrier, and such an effort would only make sense if the Chinese Navy needed a carrier and had no prospect of getting one tailor made to its requirements. If the Chinese are actually in the midst of a carrier construction right now, then converting the Varyag would make little sense. It would divert funds from domestic program which must receive favor if simply due to national pride. Having been designed for some one else's requirements it is unlikely to be perceived to fit Chinese needs as well as a native vessel. The amount of work involved means it would not get the Chinese a carrier much sooner than just waiting for their own. In all likelihood the Varyag will act purely as a training and engineering support for China's own carrier.
- JWintjes
- Posts: 1223
- Joined: Mon Jan 10, 2005 11:41 am
- Location: turning into a power-hungry Yamato-models-munching monster... buahahahaha...
- Werner
- Posts: 2299
- Joined: Mon Jan 10, 2005 1:10 am
- Location: (42.24,-87.81)
If you look through other people's Google Earth points of interest, you will find the Chinese have several aircraft carriers marked out on runways around the country. They also have duplicates of several US air fields for some reason.
If an unfriendly power had attempted to impose on America the mediocre educational performance that exists today, we might well have viewed it as an act of war.
-- "A Nation at Risk" (1983)
-- "A Nation at Risk" (1983)
- chuck
- Posts: 3384
- Joined: Mon Jan 10, 2005 1:21 pm
- Location: equidistant to everywhere
Werner wrote:If you look through other people's Google Earth points of interest, you will find the Chinese have several aircraft carriers marked out on runways around the country. They also have duplicates of several US air fields for some reason.
Aircraft carriers marked out on the run way doesn't have real operational arresting cables. It also can't verify things like will the pilot have unexpected difficulties landing if the ship is headed directly into a setting sun. A unpowered but floating flight deck, capable of being towed around to face the right direction, perhaps even capable of being towed to something near a reasonable wind-over-deck speed, is clearly a better training aid.
-
Gone Asiatic
- Posts: 836
- Joined: Tue Jan 11, 2005 7:44 pm
- Location: Zipangu - Jipukuo
Re: Is DDH a Japanese conundrum?
If you review the names of JMSDF Aegis destroyers and the present DDHs, it would appear they have already gotten over the "C" word :Dave Wooley wrote:I note that the Japanese Maritime Defence Force are designing 4 vessels which are termed DDHs or helicopter carrying destroyers. Is the definition for these 20000ton through deck destroyers just another euphemism to avoid using the "C" word . This sounds rather familiar remember the "through Deck cruiser"![]()
Dave Wooley
Myoko, Chokai, Kongo, Kirishima, Hiei, Haruna, Kurama, Shirane.
No Quarter Asked - None Given


- JWintjes
- Posts: 1223
- Joined: Mon Jan 10, 2005 11:41 am
- Location: turning into a power-hungry Yamato-models-munching monster... buahahahaha...
Ok, I'll believe that when I see it. I can see the value of a static landing platform, but actually towing it around at anything that could be called speed simply sounds like a whacky idea (which doesn't mean they won't do it, of course).chuck wrote: A unpowered but floating flight deck, capable of being towed around to face the right direction, perhaps even capable of being towed to something near a reasonable wind-over-deck speed, is clearly a better training aid.
How big is this chunk of steel? 65.000 tons? Surely makes for some nice display when a towing line breaks and the thing goes out of control...
Jorit

- Werner
- Posts: 2299
- Joined: Mon Jan 10, 2005 1:10 am
- Location: (42.24,-87.81)
Japanese "16DDH" design.

16DDH seems to be entirely consistent with Japanese policy. A departure would be a 30,000-40,000 fixed wing carrier. They have had 50+ years to watch carriers homeported in Japan, and have participated in strategic and tactical planning for carriers for just as long. If they identify the need for their own carrier, building one will be no technical or professional difficulty. Only the politiics could be a problem.
As far as Varyag is concerned, more realistic training could be accomplished with a 25-30 knot merchant conversion than lugging this hunk of overweight rust around anywhere.
Varyag was designed for features which are not useful to the PLAN (like launch tubes for very large cruise missiles which the ship will never carry, and so on. If the goal is to develop skills and doctrine, a converted container ship is the perfect first step. Using Varyag has a "hand me down" patina which I am sure is something the PLAN would like to avoid.
The true usefulness of Varyag and the ex-Commonwealth carriers scrapped in China was in understanding design and fitting details not obvious in a port call or navy day visit. It is not necessary to put the ship to sea to understand these lessons.

16DDH seems to be entirely consistent with Japanese policy. A departure would be a 30,000-40,000 fixed wing carrier. They have had 50+ years to watch carriers homeported in Japan, and have participated in strategic and tactical planning for carriers for just as long. If they identify the need for their own carrier, building one will be no technical or professional difficulty. Only the politiics could be a problem.
As far as Varyag is concerned, more realistic training could be accomplished with a 25-30 knot merchant conversion than lugging this hunk of overweight rust around anywhere.
Varyag was designed for features which are not useful to the PLAN (like launch tubes for very large cruise missiles which the ship will never carry, and so on. If the goal is to develop skills and doctrine, a converted container ship is the perfect first step. Using Varyag has a "hand me down" patina which I am sure is something the PLAN would like to avoid.
The true usefulness of Varyag and the ex-Commonwealth carriers scrapped in China was in understanding design and fitting details not obvious in a port call or navy day visit. It is not necessary to put the ship to sea to understand these lessons.
If an unfriendly power had attempted to impose on America the mediocre educational performance that exists today, we might well have viewed it as an act of war.
-- "A Nation at Risk" (1983)
-- "A Nation at Risk" (1983)
-
Guest
Are those Aegis PARs?Werner wrote:Japanese "16DDH" design.
16DDH seems to be entirely consistent with Japanese policy. A departure would be a 30,000-40,000 fixed wing carrier. They have had 50+ years to watch carriers homeported in Japan, and have participated in strategic and tactical planning for carriers for just as long. If they identify the need for their own carrier, building one will be no technical or professional difficulty. Only the politiics could be a problem.
It would be interesting to see if those 2 elevators can hold F-35s. Otherwise this ship would just be a weak and overweight 2nd line ASW platform, certainly in no way reminiscent of tradition notion of cruiser.
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
- Mark Petersen
- Posts: 96
- Joined: Mon Jan 10, 2005 5:30 pm
- Location: Kenosha, no, not the Pass the other one
- chuck
- Posts: 3384
- Joined: Mon Jan 10, 2005 1:21 pm
- Location: equidistant to everywhere
If these ships were intended to carry fixed winged aircraft such as F-35 or Harrier, then why do they want to build 4 of these little ships instead of 2 bigger ships that can project a reasonable airwing?
The reason why you want 4 smallish helicopter carriers instead of 2 larger carriers is because you are confident that you can have surface and air superiority, such as that to be provided by US CVBG, and you want to be able to cover a wide area and maintain a sizeable ASW force on station. Why would you want to do that? To break a PLAN submarine blockade, perhaps of Taiwan, perhaps of the main shipping route to Middle East, perhaps even of home islands of Japan.
Provided these ships are intended for the Chinese - there being no other possibility - it suggests that the type of war envisioned by JMD involves a fairly sustained, protracted campaign. A submarine blockade isn't worth a dime if the war is over in 2 weeks.
It does suggest that, at least in Tokyo, it is envisioned that the future naval picture in East Asia will be somewhat similar to the German-UK situation of WWI or WWII.
The reason why you want 4 smallish helicopter carriers instead of 2 larger carriers is because you are confident that you can have surface and air superiority, such as that to be provided by US CVBG, and you want to be able to cover a wide area and maintain a sizeable ASW force on station. Why would you want to do that? To break a PLAN submarine blockade, perhaps of Taiwan, perhaps of the main shipping route to Middle East, perhaps even of home islands of Japan.
Provided these ships are intended for the Chinese - there being no other possibility - it suggests that the type of war envisioned by JMD involves a fairly sustained, protracted campaign. A submarine blockade isn't worth a dime if the war is over in 2 weeks.
It does suggest that, at least in Tokyo, it is envisioned that the future naval picture in East Asia will be somewhat similar to the German-UK situation of WWI or WWII.