1/144 Kiev by Dave Wooley

Fully Documented builds that have been completed and moved from the Online Scratchbuild section.

Moderators: MartinJQuinn, JIM BAUMANN, HMAS, Tiny69, Dave Wooley

User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Post by Dave Wooley »

EPinniger wrote:The superstructure is looking very impressive. It's a dauntingly complex-looking assembly - I'm glad I stick to scratchbuilding smaller ships!
I may have missed this in an earlier update, but what did you use to cut out the rectangular windows/openings in the superstructure? I always have problems cutting out neat squares/rectangles when they're this small.

Your Yak-38 also looks very nice - what material did you use to make the airframe? Carved wood?
The cutting of the window opening is very strightforward. The process is explained earlier on . But the basic idea is always cut the opening smaller than required and ease the size to the marks using a tapering fine flat edge file with a filing surface also to the edge , I never make the initial cut to the marks.
The Yak 38 body is made from the pattern makers timber gellutong. A superb timber to model. :wave_1:
Dave Wooley
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Post by Dave Wooley »

The next stage was to build up the blast screens
around the SA-N-3 launcher these were made up
using 20thou styrene sheet and Evergreen box section.
Basically the blast screens are open on the out board face.
This was temporarily cut to size {not fixed} so as the
assembly could be adjusted symmetrically.
Image
The blast screens ready to be set into place.
Image
Each side is placed on the launcher deck housing but not fixed.
Image
How this position and the surrounding area appears, Long
way to go yet.
Image
Dave Wooley :surfer: :wave_1:
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Post by Dave Wooley »

A little catch up on progress so far . Which includes
work on the various radar arrays.
Cutting out the front and rear of the �Top Knot dome� support mast.
Image
The sides ready for assembly
Image
Top Knot mast in place
Image
Top knot dome {made from a combination of P38 fillers
and a smaller plastic ball, light and strong} Also slightly
re-modelled support plinths for the Top sail and Top Steer
radars.
Image
Soldering up the Top Sail stabilizer fins. Image
Part of the support arms being soldered up
Image
The internal frame for the stabilizer fins the paper clips
act as heat shunts to avoid the heat generated by the
soldering damaging the plastic

Image
The Topsail radar partly assembled. The frame holding the
mesh, which forms the reflector array, is soldered up using
a combination of brass wire and brass tube.
Image
Top Sail air search radar 50% complete.
Image
Under construction the support fame atop of the "Head Light" radar.
Image
The Head Light frame work almost complete using
0.31 fine brass wire. All the soldering is undertaken using an electronic variable temperature soldering iron.
Image
Completed Head Light array .The main radar reflector dish
is formed from zinc mesh and brass wire. The upper smaller
dishes are formed entirely from styrene sheet, cut and folded.
Image
The SS-N-12 launcher tubes under construction, more
on that next time.
Image
Dave Wooley :thumbs_up_1: :wave_1:
User avatar
Timmy C
Posts: 12470
Joined: Mon Jan 10, 2005 6:00 pm
Location: Ottawa, Canada

Post by Timmy C »

Beautiful and stunning work there =)
De quoi s'agit-il?
User avatar
ARH
Posts: 2557
Joined: Mon Jan 10, 2005 10:52 am
Location: Land of the Cheshire cat

Post by ARH »

Lovely bit of work Dave, she,s beginning to take shape nicely, :jump_1: :jump_1: :woo_hoo: :woo_hoo: :wave_1: :thumbs_up_1:
Simple but effective.
User avatar
Jose Chaica
Posts: 369
Joined: Sat Apr 30, 2005 1:40 pm
Location: Marinha Grande - Leiria, Portugal.

Post by Jose Chaica »

WOW !!! These pics are wonderfull !!!! Your work is.... :thumbs_up_1: :thumbs_up_1: :thumbs_up_1: :thumbs_up_1:
Keep up !!! :thumbs_up_1:

:cool_2: .
User avatar
Sean Hert
Posts: 1404
Joined: Sat Jan 08, 2005 11:17 pm
Location: Columbus, OH
Contact:

Post by Sean Hert »

:faint:

Impressive. I really appreciate your solder work- is it all scratch?
--
Sean Hert
Dino Carancini
Posts: 430
Joined: Wed Oct 11, 2006 5:46 am

Post by Dino Carancini »

Stunning!!! :thumbs_up_1: :thumbs_up_1:
User avatar
bismarck builder
Posts: 403
Joined: Wed Jan 12, 2005 3:28 am
Location: alton hampshire uk

Post by bismarck builder »

hi
wooley you rock
gary
a bad day sailing is better than a good day at the office
User avatar
johndon
Posts: 1034
Joined: Mon Jan 10, 2005 3:39 pm
Location: Newcastle Upon Tyne, England

Post by johndon »

Beautiful brass work Dave :thumbs_up_1: :thumbs_up_1:

John
User avatar
Andy G
Posts: 234
Joined: Wed Nov 02, 2005 9:12 am

Post by Andy G »

A huge thumbs' up from me too, Dave - she's looking lovely!

Andy
User avatar
Neptune
Posts: 2466
Joined: Sun Mar 13, 2005 11:51 am
Location: Belgium

Post by Neptune »

Great soldering and detailing!!!

Where will this model end up? In the Russian Navy headquarters? It sure will deserve a spot there!
It starts to look like a real Kiev now! I consider the radars as being a part of detailing, so that means you're nearing the end (although that is relative on a ship this size!)
The merchant shipyard
User avatar
Jefgte
Posts: 542
Joined: Fri Aug 26, 2005 6:53 am
Location: France

Post by Jefgte »

Fantastic work

:thumbs_up_1: :thumbs_up_1: :thumbs_up_1:



Jef :wave_1:
Current 1/700 WL
HMS Repulse
User avatar
jgrease
Posts: 363
Joined: Sat Sep 30, 2006 9:30 pm
Location: Richmond TX

Post by jgrease »

It's ridiculous how good this looks. Keep the pics coming!!!
:heh:
User avatar
nick
Posts: 832
Joined: Tue May 29, 2007 2:23 am
Location: Queen City of the South - Cebu City, Philippines
Contact:

Post by nick »

Holy cheese!

That work is amazing Dave! especially the radars and masts and everything!

:thumbs_up_1:

Keep it up!

Nick
Nichol Caballero
Civil Engineer and Ship Enthusiast
User avatar
JIM BAUMANN
Posts: 5698
Joined: Mon Jan 10, 2005 5:30 pm
Location: Nr Southampton England

Post by JIM BAUMANN »

really sharp looking work--its just sooo.... Big!!

Really nice looking solderwork--I am watching!

:thumbs_up_1: :wave_1:

JIM B
....I buy them at three times the speed I build 'em.... will I live long enough to empty my stash...?
http://www.modelshipgallery.com/gallery ... index.html

IPMS UK SIG (special interest group) www.finewaterline.com
User avatar
Guido
Posts: 723
Joined: Tue Jan 11, 2005 12:17 am
Location: Dinslaken, Germany

Post by Guido »

Excellent!
This is a lot of fun to watch!
That solder-works is just great!!! :thumbs_up_1:
Guido
AKA "Tailor"
VMF'06 - German Gamblers
Veritable Modelling Friends 2006, Germany

Never wear your best trousers when you go out to fight for freedom and truth. - H. IBSEN

http://www.youtube.com/channel/UCk8zhb1sc4Pe3BRLqq3d-SQ
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Post by Dave Wooley »

Thank you all for you kind comments and support. There are a few more pictures yet to be posted of the "Top Steer" radar . These will go up in the next few days.
Dave Wooley :thumbs_up_1: :wave_1:
Greg W
Posts: 69
Joined: Sun Oct 23, 2005 9:24 am
Location: Rochester, NY USA

Post by Greg W »

WOW that is very impressive! Greg W
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Post by Dave Wooley »

Soldered in place is the main reflector mattress for the
"Top Steer" long range and surface search radar array .
The main arm also provides support to the smaller of the
two reflectors.
Image
The back support frame being soldered up. Note the curve,
which will conform to the shape of the smaller of the
two reflectors.
Image
Reflector with the back support, ready for soldering up.
Image
Simple jig to maintain the curve whilst soldering up
Image
Top Steer almost completed
Image
Top Steer temporary in place
Image
Image
Owl Screech gun fire control radar . I�ll show how this
was made next time round .
Image
Dave Wooley
Post Reply

Return to “Completed Builds [Fully documented]”