1/144 Kiev by Dave Wooley

Fully Documented builds that have been completed and moved from the Online Scratchbuild section.

Moderators: MartinJQuinn, JIM BAUMANN, HMAS, Tiny69, Dave Wooley

User avatar
mitchell300
Posts: 347
Joined: Tue Jul 10, 2007 3:45 am
Location: Netherlands

Re: 1/96 Kiev by Dave Wooley

Post by mitchell300 »

HOLY COW o.O
Image

This is not just amazing. (the ship not the cow haha)
THIS IS FREAKING UNBELIEVEBLE (glasses smile)
:thumbs_up_1: :thumbs_up_1: :thumbs_up_1: :thumbs_up_1: :thumbs_up_1: :thumbs_up_1: :thumbs_up_1: :thumbs_up_1: :thumbs_up_1: :thumbs_up_1:
that a 10 for u
Ur to skilled (happy smile)
Mitch

(to many smileys max =10 ''-.-
New Ships Planned For Shipyard:
USS.Missouri 1.545 scale to new jersey desert combat
Ships in dock:
USS.Saratoga 1.535 scale Desert combat (currently on hold)
Ships in repair:
SMS Tirpitz 1/540 (adding new radars and fixing the main guns)
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: 1/96 Kiev by Dave Wooley

Post by Dave Wooley »

Thanks for you kind comments. This crane is almost compete, soon work can begin on the second crane which is slightly different . :thumbs_up_1:
Dave Wooley
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: 1/96 Kiev by Dave Wooley

Post by Dave Wooley »

At the head of the main jib is a swinging arm for the upper purchase
block or sheave .
This is made up by soldering 0.4 mm brass wire to the shape shown
Image
The swinging arm has a fulcrum point which coincides with the block at the
jib head. Seen here is the purchase block being assembled and is made
using PE wheels and litho for each of the grit guards.
Image
The completed swinging arm upper purchase block.
Image
The swinging arm fitted into place at the jib head.
Image
The crane nearing completion
Image
Next and final parts of the crane build are folding support arms for the pulley
frame
Dave Wooley
ingura

Re: 1/96 Kiev by Dave Wooley

Post by ingura »

...
Last edited by ingura on Sun Oct 31, 2010 7:18 pm, edited 1 time in total.
User avatar
ARH
Posts: 2557
Joined: Mon Jan 10, 2005 10:52 am
Location: Land of the Cheshire cat

Re: 1/96 Kiev by Dave Wooley

Post by ARH »

Nice one Dave. :thumbs_up_1: :thumbs_up_1: :thumbs_up_1:


see you tomorrow. :thumbs_up_1: :thumbs_up_1: :heh:
Simple but effective.
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: 1/96 Kiev by Dave Wooley

Post by Dave Wooley »

ARH wrote:Nice one Dave. :thumbs_up_1: :thumbs_up_1: :thumbs_up_1:


see you tomorrow. :thumbs_up_1: :thumbs_up_1: :heh:
I shall look forward to it. :thumbs_up_1:
Dave Wooley
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: 1/96 Kiev by Dave Wooley

Post by Dave Wooley »

ingura wrote:Hi Dave, watching your progress with the crane is a real excitement. :thumbs_up_1:

It appears that there is no borderline for you between modelling and artwork :worship_1:

cheers,
Peter. :wave_1:
Hi Peter thanks for your kind comments . When the crane is finally constructed It will , like the rest of the model await a coat of paint . But the real difficult bit comes in the rigging . I haven't quite figured it out as to were the various cables go. Thankfully all the moving bits can be removed. :scratch:
Dave Wooley
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: 1/96 Kiev by Dave Wooley

Post by Dave Wooley »

Next the support arms for the pulley frame . These two arms are fold down
to allow the frame to drop backwards. This photo shows the parts of one
support.
Image
Both supports are made up of brass tube with the lower section having and
insert thus.
Image
The purpose of the insert is to allow the lower support arms to be secured
into the base.
Image
Image
The upper supports are fitted to the underside of the pulley arm frame.
Image
The competed crane ready for painting { later on} and rigging { a more
difficult procedure}
Image
Dave Wooley :thumbs_up_1:
User avatar
Francisco P. de Nanclares
Posts: 306
Joined: Tue Apr 12, 2005 5:30 am
Location: Spain

Re: 1/96 Kiev by Dave Wooley

Post by Francisco P. de Nanclares »

Your job on this build continues to amaze me, Dave. This is going to be a superb model!. Keep those pictures coming!. :wave_1:

Cheers.
Pachi.
Image I will miss you Werner. Fair winds and following seas.
User avatar
Cadman
Site Admin
Site Admin
Posts: 3636
Joined: Sat Jan 08, 2005 4:31 pm
Location: Plattsburg, Missouri

Re: 1/96 Kiev by Dave Wooley

Post by Cadman »

Dave that crane is an awesome model by itself. :thumbs_up_1:
Timothy Dike
Owner & Administrator
ModelWarships.com
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: 1/96 Kiev by Dave Wooley

Post by Dave Wooley »

Hi Pachi and Cadman thanks for your kind comments . Presently working on the second crane which is a little more difficult as this is involving a not inconsiderable amount solder work. Pictures in due course. :thumbs_up_1: :thumbs_up_1:
Dave Wooley
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: 1/96 Kiev by Dave Wooley

Post by Dave Wooley »

The second crane that Kiev carries is outboard of the superstructure .
As no drawings exist showing any real detail the imperative was to
set to and sketch up a drawing , commencing with the tubular sides .
Image
As the crane is constructed of steel tube then the material of choice was
1mm od brass tube for the outer sections with 0.5mm brass wire for the
inner cross bracings .
Image
The next stage was to trace the sketch onto the soldering board which
is now the pattern for the side frames . The 1mm tube is cut to size and
shaped as per the sketch and placed on the pattern . The top end frame
of the purchase on the full size crane is detachable . For the model this
will be soldered up as one. Each of the cross bracings , vertical and
diagonal are added
Image
Once soldered the first side frame is removed from the soldering board
Image
This process is then repeated producing two identical side frames.
Image
The next job is to solder up the top and lower bracings .
Dave Wooley :thumbs_up_1:
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: 1/96 Kiev by Dave Wooley

Post by Dave Wooley »

With the two side frames soldered the next stage is to construct a
wood profile/jig that will allow the frame to be soldered in situ. First it
becomes necessary to draw the bracing arrangement as seen on the
upper part of the jib.
Image
A tracing is made. Which will be transferred to the timber that will form the profile.
Image
The timber Profile or jig will allow the top and lower cross bracings to be
soldered into place. This is actually made up of three profiles, upper, left and
right hand sides. And very importantly the entire profile/jig will have to be
removable once the framework of the jib is soldered up.
Image
The entire profile/jig is prepared. The three components of the profile are
bonded using impact or epoxy adhesive and sanded down to remove any
rough edges .
Image
More to follow
Dave Wooley :thumbs_up_1:
User avatar
johnny canuck
Posts: 189
Joined: Mon Sep 11, 2006 9:33 pm
Location: St. Catharines, Ontario Canada

Re: 1/96 Kiev by Dave Wooley

Post by johnny canuck »

Your work is a true inspiration. I have gone back over the build and am very impressed with the work. Seeing you build the radar structures and cranes makes it look easy. I have been inspired to attempt to scratch an AN/SPS 12 radar for my Assiniboine this weekend.

These build posts for all the various builds are an excellent source of knowledge.

Keep up the good work.
James W.

Dry docked:
1/72 HMCS Assiniboine DDE 234-1960
1/72 HMCS Ottawa DDE 229-1960
1/72 HMCS St. Catharines-River Class Frigate-1944
On the slipway:
1/72 HMCS Camrose-Flower Class Corvette-1943
1/72 HMCS Trillium-Flower Class Corvette-1942
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: 1/96 Kiev by Dave Wooley

Post by Dave Wooley »

johnny canuck wrote:Your work is a true inspiration. I have gone back over the build and am very impressed with the work. Seeing you build the radar structures and cranes makes it look easy. I have been inspired to attempt to scratch an AN/SPS 12 radar for my Assiniboine this weekend.

These build posts for all the various builds are an excellent source of knowledge.

Keep up the good work.
Glad to be of help and thanks for your kind comments .
Dave Wooley :thumbs_up_1:
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: 1/96 Kiev by Dave Wooley

Post by Dave Wooley »

Now that the profile/jig is made, the location for each cross and diagonal
bracing is marked onto the top of the profile. Following this each jib side
frames can be attached to the profile thus.
Image
Using 0.5mm brass wire the cross brace can be cut to size and place on
to each of the pre-positioned marks.
Image
All the cross bracings are held secure by the simple expedient of Scotts tape
and soldering can begin.
Image
Generally I�ll try to ensure than each section to be soldered is a GOOD butt
fit and tinned .
Image
Each of the longitudinal and diagonal TOP bracings are measured, cut to
size and placed in position. These are then removed, tinned and reset.
Image
All these bracings are then soldered into place.
Image.
Next time the tricky bit , removing the profile and repeating the whole
procedure for the lower set of bracings. But does it survive ? find out on Monday .
Dave Wooley
User avatar
ARH
Posts: 2557
Joined: Mon Jan 10, 2005 10:52 am
Location: Land of the Cheshire cat

Re: 1/96 Kiev by Dave Wooley

Post by ARH »

Well Dave, Your getting to good at this building lark, another fine example of scratch building, :thumbs_up_1: :thumbs_up_1: :thumbs_up_1: :woo_hoo: :woo_hoo:
Simple but effective.
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: 1/96 Kiev by Dave Wooley

Post by Dave Wooley »

ARH wrote:Well Dave, Your getting to good at this building lark, another fine example of scratch building, :thumbs_up_1: :thumbs_up_1: :thumbs_up_1: :woo_hoo: :woo_hoo:
Hi Ron as you know only to well It's all good fun trying to think of a method to make the whole job work? :thumbs_up_1:
Dave Wooley
User avatar
desron48
Posts: 178
Joined: Sun Sep 23, 2007 9:22 pm

Re: 1/96 Kiev by Dave Wooley

Post by desron48 »

that's truly awsome dave........i'm gonna give it a go...... :heh: ....joe
User avatar
Joachim
Posts: 179
Joined: Sun Mar 09, 2008 6:21 am
Location: Wetzlar, Germany

Re: 1/96 Kiev by Dave Wooley

Post by Joachim »

Woooow! That is so magnificent and inspiring!!! Hope you�ll see similar photos of Renown in some years time;-)

Best regards from Dortmund

Joachim
Post Reply

Return to “Completed Builds [Fully documented]”